Place: Nottingham, UK Total area: 750 m2 Year: 2019 Architect: Munawar Rao Project Details About the Project Mill Wharf, a remarkable construction from the 1980s, boasts a steel frame structure with concrete floors, clad and brick elevations, and a mix of steel-framed double-glazed and wooden casement single-glazed windows. The building […]
work
Castle Boulevard, Nottingham
Place: Nottingham, UKTotal area: 9,225 square feetYear: 2021Architect: Munawar Rao Project Details About the Project The Castle Boulevard project involved the extensive refurbishment of Howard House, a sizable office building constructed in 1995. The building, once home to multiple businesses, underwent a complete transformation to suit the needs of university students. […]
Humberstone House, Humberstone Gate
Place: Nottingham, UKTotal area: 750 m2Year: 2019Architect: Munawar Rao Project Details About the Project Late in 2021, TRENT Construction embarked on an extensive renovation project at Humberstone House, located in Leicester. This multi-story building, originally featuring open-plan design across several floors, presented an exciting challenge. Our task involved covering over […]
Haydn Road, Nottingham
Place: Nottingham, UKTotal area: 750 m2Year: 2019Architect: Munawar Rao Project Details About the Project The project involved the transformation of a former Courtaulds Factory Shop and Armstrong Mill Outlet – a massive, complex space with a rich industrial past. Our task was to reimagine and repurpose the space into an […]